City of Lubbock
Lubbock, Texas
United States
Design
Construction Management & Administration
Full-time RPR
Contractor Coordination
The City of Lubbock contracted with Plummer for a new 3 million gallons per day wastewater treatment plant. The project included a raw water pump station, pretreatment units, biological reactors, membranes, UV treatment, buildings, site work, and paving. We supported the City during the construction phase with full-service construction management and resident representative services. The project consisted of multiple structures, underground utilities, odor control, storage tank, paving, electrical, SCADA, and site work. The project design included a first-in-the-US combination of surface aerator aeration basins paired with a membrane bioreactor system and is the largest flat sheet membrane bioreactor facility in Texas.
The NHWTP has a rated capacity of 80 million gallons per day and treats surface water using a combination of processes that includes rectangular sedimentation basins.
Plummer is providing third party construction management and resident project representative services on the construction of a new 8 MG water storage tank.
We design solutions to the world's greatest challenges. We're ready to take on any problems you may run into.