City of Lubbock
Lubbock, Texas
United States
Design
Construction Management & Administration
Full-time RPR
Contractor Coordination
The City of Lubbock contracted with Plummer for a new 3 million gallons per day wastewater treatment plant. The project included a raw water pump station, pretreatment units, biological reactors, membranes, UV treatment, buildings, site work, and paving. We supported the City during the construction phase with full-service construction management and resident representative services. The project consisted of multiple structures, underground utilities, odor control, storage tank, paving, electrical, SCADA, and site work. The project design included a first-in-the-US combination of surface aerator aeration basins paired with a membrane bioreactor system and is the largest flat sheet membrane bioreactor facility in Texas.
Plummer is serving as Construction Manager and Resident Project Representative for the 10 MGD, $107M expansion.
The Village of Taos Ski Valley wastewater treatment plant provides treatment to the Village along with the ski corporation base area, hotels, and associated commercial buildings and housing.
We design solutions to the world's greatest challenges. We're ready to take on any problems you may run into.